Loss minimization

In reconfiguration of networks, it is beneficial to select the configuration that provides the minimum distribution losses.

RL

RL + Q-Learning

GA

Minimum Spanning Tree

[31]

[32]、 [57]

[58, 59]

[60]

Planning and Control

Increase generation capacity and optimize transmission and distribution system design.

ANN + GA

DRO + DNN

[5]

[61]

Voltage limit violation

Maintaining the voltages within specified limits in all parts of the distribution network is essential.

HR + ES

[3]

Protection device coordination

Coordination between protection devices in the network should be done properly in order to avoid adverse effects.

Multiagent Systems + Q-Learning

[62]

Load balance of equipment

Realize the load balance of equipment such as transformers and feeders, and avoid the situation that some equipment is overloaded and other equipment is lightly loaded.

LSTM + GRU

Q-Learning

RL + Q-Learning

HR

[63]

[64]

[56]

[35]

Real time implementation

Real time operation of restoration assistance system will be beneficial.

HS

Multiagent Systems

GAM

[65]

[66]

[36]

Cost control

Reduce power losses and switching costs in distribution networks.

LSTM + ADR

Quantum PSO

HSA

[67]

[68]

[69]