Advances, Systems and Applications
Case No | Simulation/System setup |
---|---|
1 | 6 generators with and without loss |
2 | 10 generators, which are fed by multiple types of fuels. VPE is included, as well |
3 | 13 generators with 1800Â MW and 2520Â MW load demands, in two states |
4 | 40 generators with 10500Â MW load demand |
5 | large scale systems with 80 and 120 power-generating units in two states |