Skip to main content

Advances, Systems and Applications

Table 6 Results for case III with 1800 MW load demand

From: Optimizing the resource allocation in cyber physical energy systems based on cloud storage and IoT infrastructure

Method

Best ($)

Worst ($)

Mean ($)

MJAYA

17,963.85

17,963.88

17,963.86

PSO [16]

18,030.72

18,205.92

18,401.35

CEF [31]

18,048.21

18,190.23

18,404.04

EP-SQP [17]

17,991.03

18,106.93

-